Transmission maintenance details

To have a good engine, a safe rig requires a good transmission. Transmission maintenance requirements are also numerous regulations. Today, the truck-mounted crane manufacturers simply talk about it for you. The correct and reasonable operation of the transmission, regular maintenance, is very important for ensuring the safe and reliable operation of the truck crane and prolonging the service life of the transmission. Please follow Use the following requirements:
First, lubricants
The transmission must be filled with 85W/90 vehicle gear oil (the model is based on the "Guarantee Service Manual"). It is forbidden to use inferior lubricating oil. Different types of oil cannot be mixed.
Second, the correct oil surface position
When filling the lubricating oil, the truck crane should stop on the level road and fill up to the same height as the lower edge of the oil injection hole. A slight overflow from the oil injection hole is appropriate.
Third, the running-in
When the entire vehicle runs in 2000Km (for 15 days), it is required to perform the first-time guarantee according to the requirements of the “Guarantee Service Manual”. Clean the inner cavity and replace the new gear oil (free maintenance can be provided to the nearest FAW service station), thoroughly clean the net impurities, check whether the various fasteners are loose, and re-tighten, check whether the joint surface and the oil seal leak. .
Fourth , the maintenance of the ventilation plug
The vent plug can maintain the balance of air pressure inside and outside the gearbox, avoiding the clogging of the vent hole, causing the internal pressure to increase, causing the transmission to leak oil or damage the seal. It is therefore very important to keep the vent plug clean and unobstructed. Always check the ventilation of the ventilation plug, if any contaminated, should be promptly cleaned.
Special Note: Every time you change the oil, you must clean the dirt and impurities on the drain plug (filter)! Some gearboxes require that 20,000 kilometers be filled with lubricant, and 100,000 kilometers should be replaced. Follow the instructions for maintenance. In addition, the front axle bearing of the transmission should be greased around 8000km.
Fifth , after the maintenance of the warranty
After the first guarantee, carry out maintenance every 10000Km (travel interval) and replace all gear oils. Clean the net oil and plug the impurities on the magnet (filter). Periodically check the oil level. When checking, the truck crane should be parked on a level road surface. After the oil temperature is stable, unscrew the oil filling plug. If the oil level is lower than the lower edge of the oil filling hole, add fuel to overflow from the oil filling hole.

Automatic 3D Fiber Laser Pipe Cutting Machine

Technical advantages:

1. Excellent and efficient processing: Five-axis linkage of the bus system realizes space leapfrog and flying cutting technology, and improves efficiency by more than 20-50%.

2. Pipe cutting system: user-friendly and easy to operate, with sufficient pipe process database.

3. Special bed design:reinforced integrated welding bed, after annealing and twice aging treatment, with good stability.

4. Simple and convenient maintenance: the front chuck has good sealing performance and is more durable against dust; The rear chuck blows air automatically, and the pipe wall is cleaner.

5. Automatic feeding rack(optional): realize automatic clamping, pushing and accurate feeding with fast cyclic feeding speed.

6. Good quality and high precision: front and rear full stroke precision pneumatic chuck, multi axis linkage at the same time, good cutting effect and high precision.

7. A15: Double chuck short tailing:the cutting head spans from the front to the back of the front chuck and cuts the last workpiece.The tailing ≥ 40mm can save more material costs.

8. Excellent processing performance: it adopts high rigidity thickened bed, with bus pipe cutting system and bus motor which has faster processing speed and higher precision.

9. Slag extraction system (optional): solve the problem that there is no residue on the inner wall of the pipe, eliminating the secondary vibration polishing process.

10. High efficiency feeding system (optional): high rigidity design of feeding rack, stable and fast feeding and refueling, and the cycle time is about 10 seconds.

Laser Cutting Machine Metal,Automatic Pipe Cutting Machine,Automatic Steel Pipe Cutting Machine,Tube Fiber Laser Cutting Machines

GUANGDONG CHITTAK INTELLIGENT EQUIPMENT CO.,LTD , https://www.ctklasercutter.com